Time reporting

  1. Initialisation
  2. Concept
  3. Implementation

Initialisation

Week 1

Patric Fornasier

DateDescriptionTaskEffort
18.10.2004Workspace setup / Maven setup / Maven PDF support evaluationIS
8:00 h
19.10.2004Meeting DUE / Maven SSH setup / Configuration DocuDA, IS, DO
9:30 h
20.10.2004 Project & System Docu Discussion / Maven SSH Setup / Configuration Docu DA, IS, DO
9:00 h
21.10.2004Project ScheduleDO
8:00 h
22.10.2004Project ScheduleDO
10:00 h
Total
44:30 h

Pawel Kowalski

DateDescriptionTaskEffort
18.10.2004Maven setup / Project home pageIS
8:00 h
19.10.2004Project home pageIS
2:00 h
19.10.2004Maven setupIS
2:00 h
19.10.2004Meeting DUE / Project DocumentationDO
2:00 h
19.10.2004Requirements specificationDO
2:00 h
20.10.2004Requirements specifications / Use casesDO
6:00 h
21.10.2004Requirements specification / Use Cases bexeeDO
8:00 h
22.10.2004Requirements specificationDO
4:30 h
22.10.2004XML Document formattingDO
0:30 h
Total
35:00

Total for Phase Initialisation
79:30

Concept

Week 2

Patric Fornasier

DateDescriptionTask
Effort
25.10.2004bexee core concepts investigationDA
08:30 h
26.10.2004bexee core concepts investigationDA
04:00 h
28.10.2004bexee core model discussion / Meeting with DueDA
09:00 h
29.10.2004bexee core model discussion / Meeting with DueDA
09:30 h
30.10.2004bexee core concepts investigation and documentationDA / DO
04:30 h
Total
35:30 h

Pawel Kowalski

DateDescriptionTask
Effort
25.10.2004Core bexee concepts investigationDA
08:30 h
26.10.2004Technology evaluation: AOP, Oracle BPEL engine, ActiveBPEL, IBMEV
08:30 h
28.10.2004bexee core model discussion / Meeting with DueDA
08:00 h
29.10.2004bexee core model discussion / Meeting with DueDA, DO
09:30 h
Total
34:30 h

Week 3

Patric Fornasier

DateDescriptionTask
Effort
01.11.2004bexee core model discussionDA
08:30 h
02.11.2004bexee core model discussionDA
08:30 h
03.11.2004Tomcat multithreading issuesEV
10:00 h
04.11.2004Dispatching incoming messages documentation / Sequence diagramsDO, DA
09:00 h
05.11.2004Processor Controller example documentationDO
04:30 h
Total
40:30 h

Pawel Kowalski

DateDescriptionTask
Effort
01.11.2004bexee core model discussionDA
08:30 h
02.11.2004bexee core model discussionDA
08:30 h
03.11.2004basic process scenarios and sequence investigationsDA
10:00 h
04.11.2004bexee core data model documentation and rationaleDO
08:00 h
05.11.2004core model documentations / core model interfacesDO, IMPL
08:00 h
Total
43:00 h

Total for Phase 'Concept'
153:30 h

Implementation

Week 4

Patric Fornasier

DateDescriptionTask
Effort
09.11.2004Axis Custom Provider Sample Implementation / MinutesIMPL, DA
09:30 h
10.11.2004Axis IntegrationIMPL, DA
08:30 h
11.11.2004Axis IntegrationIMPL, DA
04:00 h
12.11.2004Process controller implementation, Axis IntegrationIMPL
10:00 h
13.11.2004Axis IntegrationIMPL, DA
09:30 h
Total
41:30 h

Pawel Kowalski

DateDescriptionTask
Effort
8.11.2004Core bexee BPEL interfaces and default implementationIMPL
08:30 h
9.11.2004Core bexee BPEL interfaces and default implementationIMPL
08:30 h
10.11.2004Core bexee BPEL interfaces and default implementationIMPL
08:30 h
11.11.2004BPEL Document parsingIMPL
04:00 h
12.11.2004Process controller implementationIMPL
06:30 h
13.11.2004BPEL Document parsingIMPL
06:30 h
Total
42:30 h

Week 5

Patric Fornasier

DateDescriptionTask
Effort
15.11.2004Axis IntegrationImpl, DA
10:30 h
16.11.2004Axis IntegrationImpl, DA
12:00 h
17.11.2004Axis IntegrationImpl, DA
09:00 h
18.11.2004System ArchitectureDO
09:00 h
19.11.2004System ArchitectureDO
08:00 h
Total
48:30 h

Pawel Kowalski

DateDescriptionTask
Effort
15.11.2004BPEL document parsingIMPL, TEST
08:30 h
16.11.2004BPEL document parsing with Digester, Object factories, testingIMPL, TEST
10:00 h
17.11.2004BPEL document parsing with Digester, documentationIMPL, DO
10:00 h
18.11.2004XML-OO mapping solution documentationDO
09:00 h
19.11.2004bexee documentation, Developpers manualDO
08:00 h
20.11.2004bexee documentation, reportingDO
02:00 h
Total
47:30 h

Week 6

Patric Fornasier

DateDescriptionTask
Effort
22.11.2004Message Type and Handling ConsiderationsDA
07:00 h
23.11.2004BPEL Sample Document creation, ProcessController implementation, BexeeProvider implementationIMPL
08:30 h
24.11.2004Axis 1.2-RC2 BexeeProvider implementation & BexeeProvider test caseIMPL
12:30 h
25.11.2004Manager implementation, Axis service deployment from WSDLIMPL
09:00 h
26.11.2004MemoryDAO implementation & test cases, ID generation, ProcessController Event ImplementationIMPL
08:00 h
Total
45:00 h

Pawel Kowalski

DateDescriptionTask
Effort
21.11.2004ProcessContext and BPELProcess DAO implementation, testingIMPL, TEST
05:30 h
00:00 h
00:00 h
Total
xx:xx h

Week 7

Patric Fornasier

DateDescriptionTask
Effort
29.11.2004 Dispatcher, DAO test cases, refactoring (Object instead of XMLMessage), Undeploy IMPL
06:00 h
30.11.2004 BPELProcessFactory impl. & test, ProcessControllerFactory impl. & test, Persistence Docu, Implementing DAOs Docu IMPL
08:30 h
01.12.2004 Dispatcher Test Case, Make sample BPEL process used for demo work IMPL
08:30 h
02.12.2004Student Book Draft, Bexee Ant Tasks, Undeploy Test CaseIMPL
08:00 h
03.12.2004Student Book and Images, Bexee Deploy Ant TaskIMPL
07:00 h
04.12.2004 Manager RPC style, Minutes, Admin Refactoring, Test Cases, Ant Undeployment and Start Task IMPL
05:00 h
Total
43:00 h

Legend:

  • EV = Technology evaluation
  • DA = Design Analysis
  • DO = Documentation
  • IS = Infrastructure
  • IMPL = Implementation
  • TEST = Testing